The TIS Board operator that connects to Editable EJS Chart (Portlet).
Parameter | Value | Opt. | Description | Example |
---|
Row ID | System.Object | - | Column that includes the row ID | - |
Identifier | System.Object | opt. | Select those columns by whose content the data is to be grouped. | - |
X axis (from) | System.DateTime | - | Start grid interval | - |
X axis (to) | System.DateTime | - | End grid interval | - |
Y axis (several columns possible) | System.Double | opt. | Columns, whose values are plotted on the y axis | - |
Y2 axis (several columns are possible) | System.Double | opt. | Columns whose values are applied to the Y2 axis | - |
Parameter
Parameter | Value | Opt. | Description | Example |
---|
Add missing time intervals with 0 values | System.Boolean | opt. | Adds additional rows with value 0 for the Y axes if time intervals are missing. | - |
Apply changes of data model | System.Boolean | - | Portlets adopt changes of data model (e.g. changed column name or column type) | - |
Save Values (do not use, internal!) | System.String | opt. | Variable for saving meta information about the result set | - |